Arazoak dituzten “Noiz arte pausatu” SPD sortutako fluxuak jarduera

UPDATE 12/10/07: Hotfix as described in MSDN KB929816 solved the problem for us mentioned below. Obtain the hotfix and then install on each server on the farm. Gero, sharepoint configuration utility on each server. Here is the MS Support link for that KB: http://support.microsoft.com/kb/932816.

Aurrekariak:

Enpresa-baldintza, non ingurumen ingeniaritza kudeatzailea behar ziurtatu dugu 30 some-odd manufacturing locations located throughout the United States needs to ensure that those plants file for their various state-mandated permits in a timely fashion. One approach we’ve investigated leverages the "Pause Until Date" activity available to us via SharePoint Designer worfklow. The engineering manager (edo bere laguntzaile) enters all the required permits and reminder dates at the start of the year. The system then does all the heavy lifting.

Ingurumena:

Moss, 64 bit, Makina birtual ingurumena (garapen kutxa), 2 zerbitzariak (SQL zerbitzari batean #1, beste guztia zerbitzari batean #2).

Arazoak:

The Pause Until Date action seems like the perfect solution and it may well prove itself to be. Hala eta guztiz ere, ez da ongi atera kutxa (Gurekin).

  1. Workflow lana ez zen programatuta exekutatu, ever. I discovered this by reading through Christopher White en (http://chrissyblanco.blogspot.com/2007/06/issues-with-delay-activity-in-moss.html) excellent write-up by using stsadm thusly:

    C:\>stsadm -o getproperty -propertyname "job-workflow" -url http://localhost

    <Property Exist="No" />

    C:\>

    Duten emaitza harrigarria izan zen, baina erraz konpondu:

    C:\>stsadm -o setproperty -propertyname "job-worfklow" -propertyvalue "every 1 minutu artean 0 eta 59" -url http://localhost

    Eragiketa burutu.

    C:\>

    Gainean egiten duten, the first "In Progress" workflow azkar tiro sortu eta bere lana egin.

  2. Tamalez, the next one didn’t work as expected. Zorionez, Christopher refers us hemen (http://support.microsoft.com/kb/932816). As of writing of this entry, IT departamentuko ari gara Hotfix zuzenketa hori lortzeko zain, but it does look promising. Our copies of the affected .dll’s do not share the same byte size, beraz, espero honek arazoa konponduko.

Sahiesteko:

Re-running the stsadm -o setproperty command seemed to prod the workflow timer awake. It would, gutxi gorabehera 7 minutu geroago, actually wake up and continue along with the workflow.

Galderak / Aleak Norentzat:

Data pausatu arte ez du funtzionatzen.

Data pausatu arte ez da hasi berriro.

Workflow status does not change from "In Progress"

Workflow status stays "In Progress"

5 buruzko gogoeta "Arazoak dituzten “Noiz arte pausatu” SPD sortutako fluxuak jarduera

  1. Chris Oneslager

    Hey Paul.. Dont know ari bazara edo ez jarraipenerako. Eteteko alea dut beharrik. Nik ere 3.5 SP1 hori ere instalatu 3.0 SP2 esparrua. Beraz, beroa fix exekutatu saiatzen naiz, Ezin aurkitu produktua eguneratu da. Nik ere goroldioa SP2 instalatuta. Oraindik atzerapena lortzean. Off erauzi dut 3 eta 3.5 esparrua eta berrinstalatu. Oraindik dealy lortzean…baina nahiko gutxi kiribil bat egiten da / itxaroten gertatzen aurretik. Beste edozein iradokizun?

    Erantzun
  2. Saurabh Singh
    Hi guztiak,
    I am creating a reminder workflow using SharePoint Designer, and when I use "Pause Until Date" Jarduera. It doesn’t resume and Workflow status does not change from "In Progress".
    (I.E. it displays "Pausing for 0 minutu" bakarrik, Historia Workflow pean baina ez du hartuko zehaztutako ekintza).
    Egin dut batzuen googling azken 4 egun, eta hortik lortu nuen beroa fix - KB 932394 eta instalatuko ditu, baina oraindik am arazoak berean I Jarduera "Data arte Eten".
    Era berean, I aldatu "lan-workflow" denbora iraupena stsadm komandoa erabiliz 5 minutu 1 azpian minutu:
    stsadm -o setproperty -propertyname "job-workflow" -propertyvalue "every 1 minutu artean 0 eta 59" -url http://localhost
    baina arazo bera.
    Zer egin behar dut?
    Please suggest me why "Pause Until Date" doesn’t resume and Workflow status does not change from "In Progress" nire eu.
    Eskerrik asko,
    Saurabh Kumar Singh
    Erantzun
  3. Roxanne Whiteis

    I am having this issue in SP 2010. I’ve been banging my head against the wall for almost a week trying to resolve – to no avail. Do you have any more recent information on this “pause until date” activity never progressing?

    Erantzun

Utzi iruzkin bat du Utzi erantzuna

Zure e-posta helbidea ez da argitaratuko. Beharrezko eremuak markatu dira *